Measures that lower the risk.
Area of the mitigation, e.g. style or technical.
What to do.
Effort of the mitigation.
Expected risk reduction in points.
Overall risk from 0 to 100: base risk, style deviation and team context.
Risk level of overallRisk: below 30 low, below 50 medium, below 70 high, else critical.
Average deviation of the steps from the codebase style, 0 to 100.
Recommendations to keep the codebase style.
Style-aware risk assessment result